ASCP 12.2.5 Release Features


Oracle has provided handful of enhancements in ASCP module with the latest release. Here is a summary of some key features which are now available.

  • Collection filtered by Category Sets
    • Ability to setup category sets and then use as filter to collect/refresh only subset of product data into ASCP
    • Improves performance of collection process
  • Demand Schedule Specific Forecast processing:
    • Forecast processing options/consumption criteria definition can be done at demand schedule level with this enhancement. This allows one to submit for different region/Product LOBs separate schedules. 
    • Following options can be enabled at demand schedule level now
      • Backward days
      • Forwards days
      • Spread forecast
      • Consume by Forecast bucket
      • Explode Forecast
    • Plan level options are used if no demand schedule level values are set
    • Improved plan accuracy and allows more flexibility 
    • Plan Options> organization tab has these additional options.
  • Maximize Resource Utilization
    • Works with Constrained plan without detailed scheduling plan type only 
    • Allows better use by front loading production and minimize resource downtime
    • ASCP will also use alternate sources of supplies (e.g. alternate resources, substitute components etc.) too if needed for maximizing resource utilization 
    • There though are some fine prints on what all ASCP can do with this feature enabled, e.g. plan can violate the sourcing split % if needed for maximizing resources. 
    • Use only if key need is to front load and maximize resource utilization 
  • Extended Support for Reservation (for plan type : Constrained without detailed scheduling)
    • Support so far:
      • Reservation b/w on hand supplies & sales order demands
      • Reservation b/w on hand, internal requisitions and maintenance work order supply types to maintenance work order demands 
    • Extended support for:
      • Reservation b/w discrete jobs, process batches, purchase orders & requisitions with sales orders/process batch demands
    • Allows companies with Make To Order environment to reserve certain work order supplies to sales order demand
    • Supply - Demand reservation could be 1-1, 1-Many, Many-1 or Many-Many 
  • Enhanced Project Netting for Project Mfg environment 
  • Enhanced User experience with Alta GUI

    • Improved user interface provides ADF based Alta GUI, which is where future GUI is going towards for Oracle.
    • New supply planning work area:
      • Allows personalizing content and page layouts 
      • User can define how he wishes to review and analyze the plan output
      • Plan definition can be done with new GUI
    • Enhanced Supply/Demand workbench using new GUI
    • Favorites option
      • Taxonomy of  most used/critical elements (E.g. items, resources, suppliers, orders etc.) 
      • Planners can define their own set and use for filtering in Supply Demand work area
    • Exception Management using new GUI